Blaine Tech executed a variety of pumping tests over a three week period at this highly sensitive litigation site. Tests performed included a Step Test, (2) 72-Hour Constant Rate Tests and a weeklong Agricultural Leachate Rate Test.
Blaine Tech field personnel provided around-the-clock support for each test operating pumps and In-Situ and Solinst Pressure Transducers and managing the transfer of water into 9 Frac tanks.
In addition, Blaine Tech personnel built the project-specific drip offload network and maintained the endangered species required perimeter fencing.